起订量:
Jipad-2000ML 实验室用喷雾干燥机,实验室喷雾干燥机
1 will be placed in a position close to the ventilation equipment in good position,and is fixed at the bottom of the wheel hub;
2 white PTFE gasket placed in glass drying tower along, then dry glass tower together with gasket at the top flange and put on black, finish with black kcal hoopclamp;
3 the cyclone separator jacking have red high temperature stainless steel windmark sensing, and right, and then the cyclone separator and the drying tower is connected with the medium clamp; (stainless steel sensor can move aroundregulation, convenient connection and a cyclone separator and a drying towerbetter)
The cold trap and glass drying tower is connected with a small clamp, clamping4.Jipad-2000ML spray drying;
5 small clamps a collecting bottle and cyclone separator, the clamping connection;
More than 6 before the assembly will need to dry glass tower, cyclone separator, a cold trap, a collecting bottle washing and drying;
7 the exhaust pipe connected and inserted into the symbol of the red high temperature stainless steel outlet sensing along, and ensure that the exhaust pipetail to good local ventilation, to prevent exhaust caused damage to the experimenter;
8 the nozzle clean, and drying to ensure the nozzle outlet, a liquid outlet unblocked(feeding port and an air inlet PTFE raw material belt wrapped tight sealingapplication);
9 at the top of the spray nozzle is inserted into the instrument's mouth, and tighten the fixing knob;
The 10 connecting nozzle with blue PU tracheal diameter smaller at the top and theright side of the casing side above the quick connector, connection to ensure blue PU pipe inserted in the end;
Quick connection joint nozzle side and the right side at the top of the fast joint 11with blue PU tracheal diameter larger, connection to ensure blue PU pipe inserted in the end;
12 plug the power line, press the green button switch (boot, should note the red emergency stop in the state of gateway. Bounce is open, press get off), enter the working interface, click the button to make the peristaltic pump peristaltic pumpwork. At this time the medical silicone feeding tube along the peristaltic pump rotorto rotate into the peristaltic pump, and white clip fixed feed pipe. The above work is completed in the feeding end of the tube feeding is inserted in the feed nozzlemouth (to not easily disconnect prevail);
13 close the display peristaltic pump to stop rotating button;
In 14 experiments, the feeding tube end feed for sample bottle (should ensure that the sample is not deposited, in sample bottles with the lower part of a magnetic stirring to achieve this purpose, the experimental process as the sample specific circumstances);
15 into the work of the display screen interface, respectively, point to open the fan,heater, air compressor, the needle through the button, click the button to set the temperature of inlet wind temperature and to determine the required for the job (the set temperature should be aware of the boiling point of the solvent and solutemelting point, boiling point temperature set value should be higher than the solventto solute and low melting point);
16 with temperature curves tend to be steady, the work button click peristaltic pumpstarted to feed, feed rate as the experiment set;
17 until the test is complete, close the peristaltic pump, air compressor, needle,heater button (Note: at this point the ban closed fan button), stay out of the windtemperature lower than 30 degrees, automatic closing blower;
18 power off, disconnect the power cord. Orderly collect bottles, cold trap, cyclone separator, dry glass tower, spray (disconnect blue PU pipe should be bluecomponent of rapid joint according to the end and then easily PU tracheal off);
19 collected after the experiment materials;
20 the glass components and nozzle cleaning, drying for the next experiment.
Note: the cyclone drying tower, separator, a cold trap and a collecting bottle is fragile, installation, cleaning, drying and should be handled with care.