中航时代 品牌
生产厂家厂商性质
北京市所在地
一、应用范围:
First, the scope of application:
ZJC-150KV耐电压测试仪主要适用于固体绝缘材料如电线套管、树脂和胶、浸渍纤维制品、云母及其制品、塑料耐电压测试仪、薄膜复合制品、陶瓷和玻璃等介质在工频电压或直流电压下击穿强度和耐电压时间的测试;采用计算机控制,可对试验过程中的各种数据进行快速、准确的采集、处理,并可存取、显示、打印。
ZJC-150KV is mainly applicable to solid insulating materials such as wire tube, resin and rubber, impregnated fiber products, mica products, plastic film, and composite products, ceramic and glass medium in the frequency of the voltage or DC voltage breakdown strength and voltage withstand test time; using computer control, the various test data process the fast and accurate data acquisition, processing, and storage, display and print.
二、满足标准:
Two, meet the standard:
1、GB1408.1-2006《绝缘材料电气强度试验方法》
1. GB1408.1-2006 "test method for electrical strength of insulating materials"
2、GB1408.2-2006《绝缘材料电气强度试验方法
2, "GB1408.2-2006 electrical strength of insulating materials test methods
第2部分:对应用直流电压试验的附加要求》
Part second: Additional requirements for tests using direct voltage "
3、GB/T1695-2005《硫化橡胶工频击穿电压强度和耐电压的测定方法》
3, GB/T1695-2005 "vulcanized rubber power frequency breakdown voltage strength and voltage measurement method"
4、GB/T3333 电缆纸工频电压击穿试验方法
4, GB/T3333 cable paper power frequency voltage breakdown test method
5、HG/T 3330绝缘漆漆膜击穿强度测定法
5. Determination of the breakdown strength of insulating coatings of HG/T 3330
6、GB12656 电容器纸工频电压击穿试验方法
6, GB12656 capacitor paper power frequency voltage breakdown test method
7、ASTM D149《固体电绝缘材料工业电源频率下的介电击穿电压和介电强度的试验方法》
7. ASTM, D149, test method for dielectric breakdown voltage and dielectric strength of solid electrical insulating materials at power frequency
三、主要技术指标:
Three, the main technical indicators:
1、输入电压 AC220V 50Hz
1, the input voltage AC220V 50Hz
2、输出电压: AC:0~150kV; DC:0~150kV
2, output voltage: AC:0 DC:0 ~ 150kV ~ 150kV;
3、输出功率: 15kVA
3, output power: 15kVA
4、测量范围: AC15~150kV; DC15~150kV
4, measuring range: AC15 DC15 ~ 150kV ~ 150kV;
5、测量误差: ≤ 2%
5, measurement error: = 2%
6、升压速率: 1kV/s~5kV/s
6, pressure rate: 1kV/s ~ 5kV/s
7、耐压时间: 0~4H
7, pressure time: 0 ~ 4H
8、漏电流 1~30 mA可由计算机软件自由进行设定
8, the leakage current 1 ~ 30 mA can be set free by computer software
9、电源 交流220V±10%的单相交流电压和50Hz±1%的频率
9, the power AC 220V + 10% single-phase AC voltage and frequency of 50Hz + 1%
10、试验环境温度: 15 ~ 30℃,相对湿度:0~85%能够稳定运行。
10, test environment temperature: 15 ~ 30 DEG C, relative humidity: 0 ~ 85% can stable operation.
11、外形尺寸长×宽×高:1980mm×1220 mm×1750mm(参考)
11, the size of the long x wide * high: 1980mm * 1220 mm * 1750mm (Reference)
12、设备自重: 350Kg(参考)
12, equipment weight: 350Kg (Reference)
13、接地要求仪器需要单独接地,接地附合国家标准要求,金属棒深埋地下至少要1.5米以下
13, grounding requirements of the instrument needs to be grounded alone, the ground attached to the national standard requirements, metal rods buried underground at least 1.5 meters below
四、结构原理及性能特点:
Four, structural principle and performance characteristics:
1、主要由:升压系统(高压变压器)、测量系统、A/D转换器、放电系统、电极、油箱、电极定位架、计算机数据处理系统、软件等组成;
1, mainly by: booster system (high voltage transformer), measuring system, A/D converter, discharge system, electrode, fuel tank, electrode positioning frame, computer data processing system, software, etc.;
2、计算机---A/D转换器---测量控制系统---调压装置----升压变压器-----试样;
2, computer ---A/D converter --- measurement and control system - voltage regulator ---- step-up transformer - sample;
3、高压变压器主要产生试样所需的直流电压;
3, high voltage transformer mainly produces the required DC voltage samples;
4、调压器用于调节升压变压器输入端电压以产生高压所需的输入电压;
4. The regulator is used to adjust the input voltage of the step-up transformer to generate the input voltage;
5、电压测量主要是从高压变压器测量端测量,高压变压器测量端和高压端是线性的;
5, the voltage measurement is mainly from the high voltage transformer measurement end, high voltage transformer measurement and high voltage side is linear;
6、放电系统在试验做完以后放电,以免产生放电对人身的危害;
6, discharge system in the test after the completion of discharge, so as to avoid the harm to the human body discharge;
五、计算机系统及软件包
Five, computer systems and software packages
1、试验软件是我公司研发的功能强大、操作简单、显示直观的试验软件系统。
1, the test software is the latest research and development of our powerful, simple operation, intuitive display test software system.
2、采用计算机控制通过人机对话方式,完成对绝缘介质工频电压击穿,工频耐压试验。
2, the use of computer control through man-machine dialogue, to complete the dielectric breakdown of power frequency voltage, power frequency withstand voltage test.
3、试验过程中可动态绘制出试验曲线,试验的曲线可以多种颜色叠加对比,局部放大,曲线上任意一段可进行区域放大分析;
3, the test process can be drawn dynamically test curve, the test curve can be a variety of color superposition contrast, local amplification, arbitrary section of the curve can be analyzed in the region;
4、可对试验数据进行编辑修改,灵活适用;
4, the test data can be edited and modified, flexible application;
5、试验条件及测试结果等数据可自动存储;
5, test conditions and test results and other data can be stored automatically;
6、试验报告格式灵活可变,适用于不同用户的不同需求;
6, flexible test report format, suitable for different needs of different users;
7、可对一组试验中曲线数据的有效与否进行人为选定;
7, can be a group of test data in the curve of the effectiveness of artificial selection;
8、试验结果数据可导入EXECL,WORD文档编辑;
8, test results can be imported into the EXECL, WORD document editing;
9、软件设备人员管理功能,试验人员可设置自己的试验项目和试验参数,设置自己的试验内容后别人无法进入程序;
9, software equipment personnel management functions, the test personnel can set their own test items and test parameters, set their own test content after the others can not enter the program;
10、过电流保护装置有足够的灵敏度,能够保证试样击穿时在0.1S内切断电源;
10, over-current protection device has enough sensitivity to ensure that the sample breakdown in the 0.1S cut off the power supply;
11、仪器运行的持久性: 仪器可连续运行使用,不需为保护仪器而定期停机。
11, the operation of the instrument persistence: the instrument can be used for continuous operation, without the need to protect the instrument and regular shutdown.
六、安全说明:
Six, safety instructions:
1、设备要安装单独的保护地线。接保护地线,主要是减少试样击穿时对周围产生的较强的电磁干扰。也可避免控制计算机失控。
1, the equipment to install a separate protective ground wire. The protective earth wire is mainly used to reduce the electromagnetic interference caused by the breakdown of the sample. Can also avoid the control computer out of control.
2、直流试验放电报警功能:在设备做完直流试验时,当开启试验门时设备会自动报警,直至使用设备上的放电装置放电后报警会自动取消。
2, DC test discharge alarm function: when the equipment is completed DC test, when the test door open when the device will automatically alarm, until the use of equipment on the discharge device after the alarm will automatically cancel.
3、试验放电装置,随主机为一体化,改进了以往单独配备一根放电杆的功能。
3, the test discharge device, with the host as a whole, improved the previous single with a pole function.
4、该试验设备的电路设有多项保护措施,主要有:过流保护、失压保护、漏电保护、短路保护、直流试验放电报警等。
4, the circuit of the test equipment with a number of protective measures, including: over-current protection, voltage loss protection, leakage protection, short circuit protection, DC test discharge alarm, etc..
5、安全保护:
5, safety protection:
(1)门限位保护:不关门,即使通电点实验开始,设备无任何反应,软件有:安全门未关闭提示。
(1) threshold protection: do not close the door, even if the starting point of the experiment, the device does not have any reaction, the software has: safety door is not closed prompt.
(2)电压归零保护:如果在实验过程中,突然断电,下次开机后,会自动回到零位,保证初始电压为在零位
(2) voltage to zero protection: if in the course of the experiment, a sudden power failure, the next boot, will automatically return to zero, to ensure that the initial voltage is zero
(3)终止电压保护:可以通过软件设定终止电压,保证在升压过程中如果出现异常升到的电压后,自动终止并归零
(3) termination voltage protection: the termination voltage can be set by the software, to ensure that in the process of boosting if abnormal rise to the specified voltage, automatically terminated and zero
(4)高压机械限位:如果软件系统失去控制,电压继续往上升,到高压限位后自动归零如果在击穿后未判停,通过过流保护器采集数据保证电压自动归零有高压指示灯,通过观察指示灯的状态来判断实在升压还是在零位如果长时间做实验,为保证设备的良好运行,设备留有变压器排气口,保证变压器的良好运行,增长使用寿命如果在实验中,试样有异味或者出现燃烧和冒烟现象,可以通过排风系统进行排除。
(4) high pressure mechanical limit: if you lose control of the software system, the voltage to continue to rise, to the high pressure limit after auto zero if not to stop in after the breakdown of the overcurrent protection device to ensure the voltage data acquisition automatic zero pressure indicator, by observing the indicator of the state to determine the real boost or in zero if long time to do the experiment, in order to ensure a good operation of equipment, equipment have transformer outlet, to ensure the good performance of the transformer, and increase the service life of if in the experiment, samples or the smell of burning and smoke phenomenon, through the exhaust system were excluded.
(5)独立接地保护
(5) independent grounding protection
(6)短路保护
(6) short circuit protection
(7)软件误操作保护
(7) software malfunction protection
(8)漏电保护
(8) leakage protection
(9)实验结束放电保护
(9) discharge protection at the end of the experiment
七、 主要配置:
Seven, the main configuration:
1、主机 1台
1, the host 1 Taiwan
2、升压装置 1套
1 sets of 2, booster
3、放电装置 1套
1 sets of 3, discharge device
4、测量系统 1套
4, 1 sets of measurement system
5、电压调节装置 1套
5, 1 sets of voltage regulator
6、数据处理系统 1套
6, the data processing system 1 sets
7、计算机 1台
7, the computer 1 Taiwan
8、打印机 1台
8, printer 1 Taiwan
9、A/D转换器 1个
9, A/D converter 1
10、控制软件 1套
10, control software 1 sets
11、试验电极 1套
1 sets of 11, the test electrode
12、放电系统 1只
12, discharge system 1
13、油箱 1个
13, the tank 1
14、试验台 1个
14 test 1
15、安全防护系统 1套
15, 1 sets of safety protection system